Rib and Block Slab Calculator

A first estimate of the precast beams, hollow infill blocks, topping concrete, mesh and props for a rib-and-block first floor or roof slab, before the supplier draws the layout.

  • Works outbeams, blocks, m³ and props
  • Forfirst floors and roofs
  • Cost to youfree

Use the calculatorGet a free quote

Precast beams and hollow concrete blocks laid out for a rib-and-block first floor
Precast beams and hollow concrete blocks laid out for a rib-and-block first floor

Rib and block calculator

Enter the clear span (wall to wall, in the direction the beams run) and the width of the room across the beams.

Calculation sheetCALC 84779

Room

System

0m² of slab
0precast beams
0infill blocks
0m³ topping concrete
0mesh sheets (6 × 2.4 m)
0temporary props

An estimate only. Rib-and-block slabs are designed by the supplier or an engineer for the span and load; their layout drawing sets the beam type, spacing, mesh and props.

Copies the results into the free quote form at the foot of this page.

A rib-and-block slab is built from precast prestressed concrete beams (the ribs) laid across the walls, hollow concrete or polystyrene blocks between them, mesh on top and a concrete topping poured over the lot. This calculator gives you a quantity estimate for budgeting and for comparing supplier quotes. The supplier's layout drawing, prepared for your span and loads, is what you build from.

How the estimate is worked out

  • Beams: the width across the beams divided by the beam centres, rounded up. Each beam is the clear span plus about 110 mm of bearing on each wall, rounded up to the next 100 mm.
  • Blocks: one row between each pair of beams, with as many blocks as fit along the span at the block length you enter.
  • Concrete: the topping thickness over the whole area plus about 0.012 m³ per metre of beam to fill around the ribs, plus the extra you allow for waste.
  • Mesh: 6 m × 2.4 m sheets laid with 250 mm laps. Ref 100 or Ref 193 is common in toppings, but the design sets it.
  • Props: a line of props under the beams about every 1.2 m along the span (about every six blocks), with a prop about every 1.2 m along each line.

Spans, centres and propping

Beam centres of 560, 600 or 650 mm are common in South African systems, and blocks come in different lengths and depths depending on the manufacturer. Longer spans need deeper blocks, closer beams or a heavier beam, which is why suppliers price from a plan. Props normally stay in for about three weeks after the pour, or for as long as the supplier or engineer specifies; some polystyrene-block and semi-propless systems need fewer. Ask whether prop hire is included in each quote, and see formwork and props.

What to send with a rib-and-block quote request

Send the floor plan with the wall positions, the clear spans, whether it is a first floor or a roof slab (and whether it will carry a roof garden, a water tank or tiles), and any openings for stairs. Suppliers usually quote the beams, blocks and layout drawing, and sometimes the mesh, props and installation. The topping concrete is often ordered separately as ready-mix, usually 25 or 30 MPa. Read the full rib and block slabs guide for prices and what affects them.

Frequently asked questions

How many rib-and-block blocks per m² are there?
It depends on the beam centres and the block length. With beams at 600 mm centres and 200 mm blocks it works out to about 8 blocks per square metre. Your supplier's layout gives the exact count.
How much concrete goes on a rib-and-block slab?
Typically a 50 mm topping over the blocks plus the concrete around the ribs, which comes to roughly 0.06 to 0.08 m³ per square metre for common systems. A 30 m² first floor needs about 2 m³.
How long do props stay under a rib-and-block slab?
Usually about 21 days after the topping is poured, or as the supplier or engineer specifies. Removing props early is a common cause of cracking and sagging.
Can I use this calculator instead of an engineer's design?
No. It is for budgeting and comparing quotes. Rib-and-block slabs must be designed for the span and load by the supplier or an engineer, and NHBRC-enrolled houses need the design on file.

More concrete calculators

Concrete services and supplies

Get a free concrete quote

Tell us what you need and where. A contractor or supplier who works in your area quotes you directly. Free, no obligation.

Pour docketPD 138002

Pour calculator (optional)

Length and width in metres, thickness in millimetres. Add a row for each slab, footing or path. The totals go into your request.

#Length mWidth mThick mmQty
1×××
2×××
3×××
0m² area
0m³ concrete
06 m³ trucks

Order about 5–10% more than the net volume to allow for waste and uneven ground.