Foundation and Footing Calculator

Concrete for strip footings and column bases, the trench excavation and the spoil to remove, and the cement bags if you mix the footings on site.

  • Works outm³, trucks and spoil
  • Forstrip footings and bases
  • Cost to youfree

Use the calculatorGet a free quote

Dug foundation trenches for a house with pegs, string lines and a level
Dug foundation trenches for a house with pegs, string lines and a level

Footing calculator

Add up the length of every wall that gets a footing: the outside walls plus the internal load-bearing walls.

Calculation sheetCALC 62045

Strip footings

Column bases (optional)

0m³ of concrete
0m³ of excavation
0m³ of spoil (bulked)
0bags of cement if site-mixed

Copies the results into the free quote form at the foot of this page.

Foundations are the first concrete on a new house or extension, and usually the first thing the building inspector checks. The calculator gives you the volume of concrete for strip footings and pad bases, how much soil comes out of the trenches and how many bags of cement you need if you mix on site rather than order ready-mix.

Typical footing sizes

For a single-storey house with brick walls on stable soil, strip footings of about 600 mm wide and 200 to 250 mm thick, cast at the bottom of a trench dug to firm ground, are a common starting point. Double-storey walls, heavy roofs and weaker ground need wider or deeper footings. On clay, collapsible sand, fill or dolomite, an engineer designs the foundation, and the NHBRC or your council's approved plans set the final sizes.

FootingWidthThickness
Garden or boundary wall400–600 mm150–200 mm
Single-storey house, stable soilabout 600 mm200–250 mm
Double-storey house600–800 mm250–300 mm, as designed
Column or pier baseas designed300 mm or more

Measuring the wall length

Use the centre line of each wall. For a simple rectangle, double the length plus the width, then add every internal wall that carries the roof or a floor above. A 12 m × 8 m house with two internal load-bearing walls of 8 m has 2 × (12 + 8) + 16 = 56 m of footing. Add the steps and fireplaces separately, and add column bases for carports and verandas as bases.

Excavation, spoil and inspection

Trenches are dug until they reach firm, undisturbed ground, which is often deeper than the footing itself. The calculator counts the full trench for excavation. Dug soil bulks by about a quarter to a third, so plan for skips or a tipper load if it can't be spread on site. Ask for the trenches to be inspected before the concrete goes in, keep them free of loose soil and water, and pour on firm ground. The full guide to concrete foundations covers footings, rafts and haunched slabs.

Frequently asked questions

How do I calculate concrete for a strip footing?
Multiply the total length of the footing by its width and thickness, all in metres. 56 m of footing, 0.6 m wide and 0.2 m thick, is 56 × 0.6 × 0.2 = 6.7 m³. Add 5 to 10% for uneven trench sides.
What size should house foundations be in South Africa?
For a single-storey brick house on stable soil, strip footings of about 600 mm wide and 200 to 250 mm thick are common. The approved plans, the NHBRC requirements or the engineer's design set the final size.
What strength concrete is used for foundations?
Usually 20 to 25 MPa for house footings. Engineers sometimes specify more for rafts, ground beams and difficult soils.
How much soil comes out of the trenches?
The trench volume, which is the length × width × depth, plus about 30% because loose soil takes up more space. 56 m of trench 0.6 m wide and 0.7 m deep is 23.5 m³ in the ground, about 30 m³ loose.

More concrete calculators

Concrete services and supplies

Get a free concrete quote

Tell us what you need and where. A contractor or supplier who works in your area quotes you directly. Free, no obligation.

Pour docketPD 385073

Pour calculator (optional)

Length and width in metres, thickness in millimetres. Add a row for each slab, footing or path. The totals go into your request.

#Length mWidth mThick mmQty
1×××
2×××
3×××
0m² area
0m³ concrete
06 m³ trucks

Order about 5–10% more than the net volume to allow for waste and uneven ground.