Concrete Curing and Strength Calculator

Enter the day the concrete was poured and the conditions, and see when you can walk on it, strip the shutters, park on the driveway, take the props out and lay the flooring.

  • Works outdates and strength
  • Forfloors, driveways, slabs
  • Cost to youfree

Use the calculatorGet a free quote

A new concrete driveway kept damp under plastic sheeting while it cures
A new concrete driveway kept damp under plastic sheeting while it cures

Curing calculator

Dates are typical for normal concrete kept damp. The supplier, contractor or engineer's instructions take priority.

Calculation sheetCALC 97336

    Copies the results into the free quote form at the foot of this page.

    Concrete doesn't dry hard; it gains strength as the cement reacts with water, quickly at first and then more slowly. That is why it must be kept damp, and why the dates for walking on it, driving on it and loading it depend on the temperature and the cement. The calculator turns the pour date into a timeline you can plan around.

    How to cure concrete

    • Start as soon as the surface can take it, usually a few hours after finishing, when your finger no longer leaves a mark.
    • Keep it damp for at least seven days, longer in cold weather: cover it with plastic sheeting weighted at the edges, keep hessian or sand on it wet, or spray on a curing compound.
    • Protect it from sun, wind and frost. Hot, windy days dry the surface too fast and cause cracks; on cold Highveld nights, cover it.
    • Don't flood a fresh driveway with a hose jet; a fine spray is enough.

    Strength gain at a glance

    Concrete kept moist at about 20 °C typically reaches around 45% of its 28-day strength after three days, 70% after a week and close to 90% after two weeks. The strength class you order, such as 25 MPa, is the strength at 28 days. Cold weather and blended or 32.5 cements gain strength more slowly, which is why the calculator pushes the dates out for them.

    Props, shutters and loads

    Side shutters can come off after a day or two because they only hold the shape. Soffit shutters and props under suspended and rib-and-block slabs carry the full weight, so they stay in for about three weeks, or as the engineer specifies. Don't stack bricks, roof tiles or a water tank on a new slab until it has reached its design strength. See formwork and props and concrete driveways for more.

    Frequently asked questions

    How long before I can walk on new concrete?
    Usually after 24 hours in mild weather, carefully and in flat shoes. In cold weather wait about two days.
    When can I drive on a new concrete driveway?
    Light cars after about seven days in mild weather, and heavy vehicles such as delivery trucks after 28 days. Allow longer in cold weather.
    How long should concrete be kept wet?
    At least seven days, and ten or more in cold weather or with blended cements. The longer it stays damp, the stronger and more durable the surface.
    Does concrete reach full strength in 28 days?
    The specified strength is measured at 28 days, and properly cured concrete should reach it by then. It keeps gaining a little strength for months afterwards.

    More concrete calculators

    Concrete services and supplies

    Get a free concrete quote

    Tell us what you need and where. A contractor or supplier who works in your area quotes you directly. Free, no obligation.

    Pour docketPD 381682

    Pour calculator (optional)

    Length and width in metres, thickness in millimetres. Add a row for each slab, footing or path. The totals go into your request.

    #Length mWidth mThick mmQty
    1×××
    2×××
    3×××
    0m² area
    0m³ concrete
    06 m³ trucks

    Order about 5–10% more than the net volume to allow for waste and uneven ground.

    Strength, if you know it
    Tick what applies (optional)